High grade zinc intersections continue at Red River Resources’ Thalanga Zinc Project

Highlights: Assays received from broad 18.1m zone of massive and semi-massive sulphide mineralisation intersected in LTED05W1 at Liontown East, from 486.9m down-hole LTED05W1 returned a very high-grade intercept of 6.1m @ 24.4% Zn Eq. from 486.9m down-hole, within a larger intercept of 18.1m @ 11.5% Zn Eq. from 486.9m to 505.0m down-hole –    6.1m @ 24.4% Zn Eq. (0.7% Cu, …